![]() ![]() Linden Drive between Easterday Lane and Colwood Drive is closed permanently access to the Vet Diagnostic Lab is only available using this bridge connection.June 12 to June 16: The contractor will continue with wing repairs, joint repairs, deck prep, surface repairs and deck overlays in the southbound lanes. This replaces the old pedestrian-bicycle bridge previously closed for structural integrity concerns. Linden Drive between Colwood and Easterday Lane is eastbound only.Ī pedestrian and vehicle bridge across Willow Creek - connecting Linden Drive - opened July 9. ![]() The eastbound bus stop has been moved to the east of Colwood Drive. Several area sidewalks and paths are unavailable while work takes place, please follow on-site detour signage. Lot 62 and Easterday Lane between Observatory Drive and Linden Drive are permanently closed area will be absorbed for the Veterinary Medicine building addition. West campus projects Veterinary Medicine addition + Gym-Nat replacement projects Lanes on University Avenue remain shifted. One lane of northbound Charter Street between University Avenue and Johnson Street remains closed. Mills Street between University Avenue and Johnson Street is closed to two-way traffic until late summer 2022 detour via Brooks, Charter, or Park Street. South campus projects Chemistry building addition project The east-west sidewalk south of Johnson Street closed from just west of East Campus Mall until Lake Street.ĭetour signage will be on site to direct pedestrians and bicyclists.The southern lane of Johnson Street closed from the Johnson & Park bus stop (#0455) up to the intersection with Lake Street.Pedestrians and bicyclists will need to cross Johnson Street near the intersections of Park Street or Lake Street, as the mid-block East Campus Mall crossing will be unavailable. Section of East Campus Mall between Johnson Street and Dayton Street.These closures are expected to last into mid-winter/early 2022, depending on weather conditions: Starting the week of August 16, various closures will happen in and around East Campus Mall. ![]() Park Street’s (northbound) right turn lane onto Johnson Street is closed. Southern lane of Johnson Street closed between the bus stop outside Sellery Hall up to Lake Street. Latest information update in 8/9/21 news post East campus projects Sellery Hall steam project Access between Lathrop Drive and Charter Street will be available throughout this work.įor project updates, see the Bascom-Lathrop project page.Several areas of Lot 5 (east) are closed.Detour using Observatory Drive, University Avenue, Johnson Street, or another similar route. Lathrop Drive is closed to thru traffic, with both lanes closed from Lincoln Drive to Park Street.Construction during this phase is concentrated along Lathrop Drive, and includes multiple stages of work, and will last until July 2022. Updated AugCentral campus projects Bascom-Lathrop utility projectĪ new phase of the Bascom-Lathrop utility project has begun. Learn about current parking and transportation operations in the Transportation Services Operational Response Hub. Reminder: project dates are subject to change due to weather or other factors. This page will be updated with project changes and new work as information becomes available. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |